US Air Force needs 500 next-gen fighters, bombers to beat China, think tank says
The Mitchell Institute for Aerospace Studies recommends the U.S. Air Force procure at least 500 next-generation aircraft (300 F-47 fighters and 200 B-21 bombers) to counter China, significantly exceeding current plans of 185 F-47s and 100 B-21s. This policy recommendation could drive major procureme
Cabrillo Club
Editorial Team · February 16, 2026

Also in this intelligence package
Segment Impact Analysis: USAF Next-Generation Aircraft Procurement Expansion
Executive Summary
The Mitchell Institute's recommendation for a dramatic expansion of next-generation aircraft procurement—from 285 to 500 aircraft—represents a potential $150-200 billion market opportunity that will reshape the defense aerospace industrial base over the next 15-20 years. While currently a think tank recommendation, the Mitchell Institute's historical influence on Air Force acquisition strategy, combined with intensifying strategic competition with China, suggests a high probability of congressional and DoD adoption in some form. This policy shift would not only benefit prime contractors Boeing (F-47) and Northrop Grumman (B-21) but would trigger a cascading demand surge across the entire aerospace supply chain, from advanced materials manufacturers to cybersecurity providers.
The timing is particularly significant as the FY2025 budget cycle approaches and the Air Force conducts its force structure assessments. Contractors across multiple segments face a critical 6-18 month window to position themselves for this potential procurement wave. The expansion would stress existing supply chains already challenged by skilled labor shortages and advanced manufacturing capacity constraints, creating both opportunities for well-prepared suppliers and existential risks for those unable to scale. The compliance burden—particularly CMMC 2.0, ITAR, and DFARS cybersecurity requirements—will serve as a market filter, potentially consolidating market share among contractors who have invested early in compliance infrastructure.
The strategic implications extend beyond direct aircraft manufacturing. This procurement expansion signals a broader shift toward high-end conventional warfare capabilities, which will drive parallel investments in advanced sensors, electronic warfare systems, autonomous technologies, weapons integration, and sustainment infrastructure. Contractors who can demonstrate rapid scaling capability, advanced manufacturing readiness, and robust cybersecurity postures will capture disproportionate market share in what could become the defining defense procurement program of the 2030s.
Impact Matrix
Defense Prime Contractors (Aircraft Manufacturing)
- Risk Level: Medium
- Opportunity: Direct beneficiaries Boeing and Northrop Grumman face a potential doubling of production requirements (F-47: 185→300; B-21: 100→200), representing $100-150B in prime contract value. However, this creates execution risk around production rate acceleration, supply chain management, and workforce scaling. Lockheed Martin faces competitive pressure as resources shift toward next-gen platforms, but gains opportunities in mission systems integration, sensors, and weapons systems for these aircraft.
- Timeline: FY2025-FY2026 budget cycles will be critical; primes need to begin supply chain capacity assessments and workforce planning immediately. Production rate decisions likely by Q2 2025.
- Action Required: Immediate actions include: (1) Conduct supply chain vulnerability assessments identifying single-source suppliers and capacity constraints; (2) Initiate workforce development partnerships with technical colleges and apprenticeship programs in key manufacturing regions; (3) Accelerate digital manufacturing and automation investments to achieve required production rates; (4) Engage congressional delegations to secure multi-year procurement authority and advance appropriations; (5) Establish supplier development programs to qualify second sources for critical components.
- Competitive Edge: Sophisticated primes are already pre-positioning by establishing "production readiness" tiger teams that map every component, process, and supplier against doubled production scenarios. They're using this analysis to approach Congress with specific "industrial base investment" requests that de-risk the program before official authorization—essentially getting taxpayer funding for capacity expansion under the guise of supply chain resilience. The smartest play is creating detailed "production acceleration playbooks" that demonstrate to the Air Force how you can achieve target rates 18-24 months faster than competitors, making your program the lower-risk choice for accelerated procurement.
Tier 1 & Tier 2 Aerospace Suppliers
- Risk Level: High
- Opportunity: Suppliers of airframe structures, propulsion components, avionics, and mission systems face a potential 75-100% increase in production volumes. This segment includes companies producing advanced composites, titanium forgings, landing gear systems, hydraulics, and environmental control systems. The opportunity spans $40-60B across the supply chain, but comes with significant execution risk for suppliers unable to scale manufacturing capacity, secure skilled labor, or meet increasingly stringent cybersecurity requirements.
- Timeline: Immediate action required. Primes will begin supplier capacity surveys Q1 2025. Suppliers must demonstrate scalability by Q3 2025 to remain in supply chain for expanded production. CMMC Level 2 certification will become a de facto requirement by mid-2026.
- Action Required: (1) Achieve CMMC Level 2 certification immediately—this will become a competitive differentiator within 12 months; (2) Invest in advanced manufacturing technologies (additive manufacturing, automated fiber placement, robotic assembly) to increase throughput without proportional labor increases; (3) Secure long-term material supply agreements for critical materials (titanium, specialized alloys, carbon fiber); (4) Develop workforce training programs and explore automation for labor-intensive processes; (5) Pursue strategic partnerships or acquisitions to gain redundant manufacturing capacity; (6) Implement digital thread/digital twin capabilities to demonstrate production readiness and quality control to primes.
- Competitive Edge: The winning move is to approach primes NOW with unsolicited "capacity expansion proposals" that include specific capital investment plans, timeline to increased production rates, and risk mitigation strategies. Package this with a request for non-recurring engineering (NRE) funding or advance payments to finance the expansion. Sophisticated suppliers are also leveraging this opportunity to negotiate long-term pricing agreements that lock in margins before competition intensifies, and securing "preferred supplier" status by offering primes equity stakes or revenue-sharing arrangements that align incentives. The ultimate competitive advantage is demonstrating you can scale faster than competitors by showing existing relationships with second-tier suppliers, available factory floor space, and pre-negotiated workforce development agreements with local technical colleges.
Advanced Manufacturing & Materials Science
- Risk Level: Medium
- Opportunity: Manufacturers specializing in advanced composites, additive manufacturing, precision machining, and specialized materials (radar-absorbent materials, high-temperature alloys, stealth coatings) will see sustained demand growth. Next-generation aircraft require significantly more advanced materials than legacy platforms—the B-21 alone uses advanced composites for approximately 50% of its airframe. This creates a $10-15B opportunity for materials and advanced manufacturing process providers over the program lifecycle.
- Timeline: 12-24 months to establish qualification and production readiness. Material qualification processes for aerospace applications typically require 18-36 months, making immediate action critical.
- Action Required: (1) Initiate material qualification programs with prime contractors and Air Force labs (AFRL) immediately; (2) Invest in production scaling for qualified processes—particularly automated composite layup, additive manufacturing of flight-critical components, and advanced coating application; (3) Achieve AS9100D certification and implement statistical process control to meet aerospace quality standards; (4) Develop intellectual property protection strategies for proprietary materials and processes; (5) Establish partnerships with research institutions to stay ahead of next-generation material requirements; (6) Secure ITAR registration and implement export control compliance programs.
- Competitive Edge: The sophisticated play is to embed your engineers directly at prime contractor facilities as "resident technical experts" who can influence design decisions toward your materials and processes early in the development cycle—once a material is designed into the aircraft, switching suppliers becomes prohibitively expensive. Simultaneously, pursue Air Force SBIR/STTR funding to co-develop next-generation materials that will be required for future spiral upgrades, positioning yourself as the sole-source provider for critical future capabilities. The most aggressive contractors are also acquiring smaller competitors with complementary technologies to offer integrated material solutions rather than point products, making themselves indispensable to the supply chain.
Cybersecurity & IT Infrastructure Providers
- Risk Level: Medium
- Opportunity: The expanded procurement will dramatically increase the number of contractors in the supply chain requiring CMMC Level 2 certification, NIST 800-171 compliance, and DFARS 252.204-7012 implementation. Additionally, next-generation aircraft programs involve extensive digital engineering, cloud-based collaboration, and supply chain data sharing, all requiring robust cybersecurity infrastructure. This creates a $2-3B opportunity for cybersecurity service providers, managed security service providers (MSSPs), and compliance consulting firms specializing in defense contractors.
- Timeline: Immediate demand surge expected Q1-Q4 2025 as suppliers scramble to achieve CMMC compliance. Long-term sustained demand through 2030+ as supply chain expands and compliance requirements evolve.
- Action Required: (1) Develop specialized CMMC assessment and implementation service packages tailored to aerospace manufacturers; (2) Achieve CMMC Third-Party Assessment Organization (C3PAO) certification to provide official assessments; (3) Create industry-specific compliance frameworks that address both CMMC and ITAR requirements simultaneously; (4) Build partnerships with manufacturing execution system (MES) and enterprise resource planning (ERP) providers to integrate cybersecurity into operational technology; (5) Develop managed security services specifically designed for manufacturing environments with legacy equipment; (6) Create training programs for aerospace supplier personnel on CUI handling and cybersecurity awareness.
- Competitive Edge: The winning strategy is to offer "compliance-as-a-service" packages that bundle CMMC assessment, remediation, managed security services, and ongoing compliance monitoring into a single monthly fee—removing the capital expenditure barrier for smaller suppliers. Sophisticated providers are also creating "supply chain cybersecurity consortiums" where multiple suppliers share security infrastructure (SOC services, threat intelligence, incident response) to achieve economies of scale, positioning themselves as the consortium operator. The ultimate competitive move is partnering with primes to become their "recommended cybersecurity provider" for their supply chain, essentially gaining a captive market of suppliers who need compliance to maintain their contracts.
Engineering & Technical Services (R&D Support)
- Risk Level: Low
- Opportunity: Expanded aircraft procurement drives demand for engineering services across the entire development and production lifecycle: systems engineering, test and evaluation, modeling and simulation, digital engineering, reliability engineering, and sustainment engineering. The shift to digital engineering and model-based systems engineering (MBSE) for next-generation platforms creates opportunities for contractors with advanced capabilities in digital thread, digital twin, and simulation technologies. Estimated opportunity: $5-8B across program lifecycle.
- Timeline: Near-term opportunities (6-18 months) in production engineering and test support; sustained long-term demand through 2040+ for sustainment engineering and modernization support.
- Action Required: (1) Develop specialized expertise in digital engineering tools and processes (MBSE, digital thread, digital twin); (2) Build capabilities in advanced simulation and modeling, particularly for low-observable (stealth) characteristics, aerodynamics, and mission systems integration; (3) Recruit engineers with security clearances and next-generation aircraft experience; (4) Establish partnerships with primes for embedded engineering support roles; (5) Invest in high-performance computing infrastructure for complex simulations; (6) Develop proprietary tools and methodologies that provide unique value in production engineering or sustainment optimization.
- Competitive Edge: The sophisticated approach is to position your firm as the "digital engineering integrator" who can bridge legacy engineering processes with modern digital thread requirements—most aerospace suppliers are struggling with this transition. Offer to embed your team to help suppliers implement digital engineering practices while simultaneously gathering intelligence on supply chain challenges that you can package into consulting services for the primes. The most aggressive firms are also developing proprietary AI/ML tools for predictive maintenance and reliability optimization that they can license to both primes and the Air Force, creating recurring revenue streams beyond traditional engineering services contracts.
Training, Simulation & Mission Support Services
- Risk Level: Low
- Opportunity: A 75% increase in next-generation aircraft inventory will require proportional expansion of pilot training, maintenance training, mission planning systems, and simulation infrastructure. The Air Force's shift toward synthetic training environments and live-virtual-constructive (LVC) training creates opportunities for contractors providing advanced simulation, virtual reality training systems, mission planning software, and training services. This segment represents a $3-5B opportunity, with particularly strong growth in contractor-operated training services and simulation-as-a-service models.
- Timeline: Training system development typically lags aircraft production by 2-4 years; initial opportunities emerge 2026-2028, with sustained demand through 2045+.
- Action Required: (1) Develop next-generation aircraft-specific training systems and courseware; (2) Invest in virtual reality/augmented reality training technologies that reduce reliance on expensive flight hours; (3) Build partnerships with prime contractors to integrate training system development into aircraft development programs; (4) Pursue Air Force contracts for contractor-operated training services; (5) Develop exportable training systems for international partners (subject to ITAR); (6) Create AI-powered adaptive training systems that personalize instruction and optimize training efficiency.
- Competitive Edge: The winning move is to propose "total training solutions" that combine hardware, software, courseware, and instructor services into performance-based contracts where you're paid based on training outcomes (pilot proficiency) rather than hours delivered—this aligns your incentives with Air Force objectives and creates barriers to competition. Sophisticated contractors are also pursuing international partnerships to amortize training system development costs across multiple customers, then offering the Air Force a lower price point than competitors who are developing U.S.-only solutions. The ultimate competitive advantage is embedding your simulation technology directly into the aircraft's mission systems, making your training systems the only ones that can accurately replicate aircraft performance.
Cross-Segment Implications
Supply Chain Cascade Effect: The doubling of aircraft procurement creates a multiplicative effect down the supply chain. Each aircraft contains approximately 300,000 parts from 1,000+ suppliers across 4-5 tiers. A 75% increase in prime production translates to similar increases for Tier 1 suppliers, but potentially 100-150% increases for Tier 2 and Tier 3 suppliers who serve multiple Tier 1 customers. This creates vulnerability to bottlenecks at lower tiers where suppliers may lack capital, workforce, or technical capability to scale. Sophisticated prime contractors will need to implement supplier development programs and potentially provide financial assistance to critical lower-tier suppliers to prevent supply chain failures.
Cybersecurity as Market Filter: CMMC Level 2 requirements will function as a de facto barrier to entry, potentially eliminating 30-40% of current aerospace suppliers who lack resources or sophistication to achieve compliance. This creates consolidation opportunities for larger suppliers and cybersecurity service providers, but also creates supply chain risk if critical niche suppliers exit the market. The cross-segment implication is that cybersecurity providers who can enable small manufacturers to achieve compliance become strategically valuable to primes seeking to preserve supply chain diversity.
Workforce Competition Intensification: All segments will compete for the same limited pool of aerospace engineers, advanced manufacturing technicians, and cleared personnel. The expanded procurement occurs against a backdrop of aerospace workforce aging (average age 47+) and insufficient STEM pipeline development. This creates cross-segment implications where workforce development investments by one segment benefit the entire ecosystem, but also where aggressive recruiting by primes and Tier 1 suppliers may destabilize smaller suppliers. Strategic contractors are establishing regional workforce development consortiums to expand the overall talent pool rather than simply competing for existing workers.
Advanced Manufacturing Technology Diffusion: Investment in advanced manufacturing by primes and large suppliers will accelerate technology diffusion to lower tiers as primes mandate specific processes or provide technical assistance. This creates opportunities for technology providers (additive manufacturing equipment, robotics, digital manufacturing software) but also raises the competitive bar for all suppliers. Contractors who adopt advanced manufacturing early gain cost and quality advantages, while laggards face obsolescence.
Compliance Infrastructure Interdependencies: CMMC, ITAR, and DFARS compliance create interdependencies between cybersecurity providers, IT infrastructure providers, and manufacturing operations. Suppliers cannot achieve compliance in isolation—they require integrated solutions spanning physical security, IT security, personnel security, and operational procedures. This creates opportunities for systems integrators who can provide turnkey compliance solutions, but also creates vulnerability where failure in one domain (e.g., cybersecurity breach) can cascade to affect physical production and contract performance.
International Competition and Partnership Dynamics: Expanded U.S. procurement will influence allied nations' procurement decisions, creating export opportunities for U.S. contractors but also potentially strengthening international competitors. The cross-segment implication is that contractors with international partnership strategies can amortize development costs and achieve economies of scale, while purely domestic-focused contractors may face cost disadvantages. However, ITAR restrictions create tension between export opportunities and security requirements, requiring sophisticated export control compliance across all segments.
How ready are you for CMMC?
Take our free readiness assessment. 10 questions, instant results, no email required until you want your report.
Check Your CMMC ReadinessCabrillo Club
Editorial Team
Cabrillo Club helps government contractors win more contracts with AI-powered proposal automation and compliance solutions.